How long will it take to build a custom garage in Bonita Springs?Briefly, depending on the specifics of the garage addition, it can take anywhere from a couple of weeks to a couple of months. Why?First of all, when building a garage that is truly a custom design, the first stage is the completion of the custom design (the blueprint). Further, it is always important to consider the specifics of the soil and terrain to make sure that the foundation is a good match for the expected flow of water on your property in in Bonita Springs. Once the design is complete and the permits are issued (plus the financing has been secured), then one of the next big factors that can influence how long the actual construction takes is... the weather. If there are no delays from severe weather, then the construction of the garage addition in Bonita Springs can at least begin to be built in as little as a week (if there are absolutely no delays relating to all of the initial "paperwork"). So, completion time for custom garage renovations in Bonita Springs can range from many weeks (for large custom garage additions) down to a few days (like for building a garage addition as a conversion from an existing carport). If you just want a custom renovation of an existing garage, the smallest jobs can be done in several hours (for the very simplest garage remodels, which would not even require building permits from the city of Bonita Springs). |
What are the steps for building a garage in Bonita Springs?Before the actual construction stages, there are the pre-construction stages, including the survey of the property, the architectural drafting of the blueprint, the obtaining of building permits, and the financing of the construction. In some cases, Bonita Springs home owners will have completed all of those steps before contacting the building contractor. However, our garage builders in Bonita Springs can also help you to complete all of these steps of planning and preparation.Next comes the actual construction. Typically, that involves preparing the ground (leveling the earth) to be ready for pouring the concrete foundation. Then, the crew will set up the boards that will form the wet concrete as it dries (plus place the grid of steel for reinforcement). Once the slab is ready for framing, then the frame can be built, plus electrical wiring can be added. Once the wiring is ready, then one of the next steps is the installation of the garage door and the opener. Later, roof trusses will be attached and then the roof decking and exterior roof will be installed. At that point, the new garage addition in Bonita Springs is functional, but still not quite complete. Once all the relevant inspections have been completed by the staff of the city of Bonita Springs, then the interior walls can be finished (including insulation and drywall/ sheetrock). One of the last steps is typically the completing of the exterior with siding, stucco, and/or painting, |
How much will it cost for the garage builders to construct a custom garage addition?On the low-end, it is rare for a standard stick-built 1-story garage to cost less than $40 / square foot (even with an unfinished interior). Depending on the details (including the height, whether you already have a suitable concrete foundation in place, etc), the costs can be much higher than that.Naturally, the cost of custom garage construction jobs will be easier to estimate once the main details of the desired garage are clear to the estimator. With any big job, there will be a few variables that will allow people to keep the basic costs low (like the exterior surface of the garage and the angle of the roofline). When you contact a garage addition estimator in Bonita Springs through this site, it is best to let us know your top priorities, such as "curb appeal," keeping the budget modest, urgency of fast completion, or something else. To request your consultation now, click contact your new garage addition contractor. |
Before: | After: | |
Before: | After: |
During: | After (prior to final painting of exterior to match the home) |
During: | After: (click for a photo gallery showing the entire construction process) |
During: | After: |
Before: | During: |